• About
  • Safety
  • Quality
  • Our Work
    • Industrial
    • Transportation
  • Locations
  • Careers
  • Contact
  • Apply Today
  • COVID-19
Header5.jpg
Mass Electric
  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
    • Transportation
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Hide Search Field
Show Search Field

Hellgate Line Catenary Modifications

Home    »    Our Work    »    Industrial    »    Special Systems    »    Hellgate Line Catenary Modifications

Related Projects

  • Central Artery/Tunnel Security Project
  • Farley Pavilion Electrical Room Upgrade
  • Foothills Extension Phase 2A Design-Build
  • Hellgate Line Catenary Modifications
  • Leonard P. Zakim / Bunker Hill Bridge
  • Midtown Tunnel Project
  • OCSD Variable Frequency Drives Upgrades Project

Back to Previous Page

View Summary List of Related Projects

Hellgate Line Catenary Modifications - Bronx, N.Y. & Westchester, N.Y.

Hellgate Line Catenary ModificationsThis project entailed rehabilitation of eight segments of catenary lines from New Rochelle to Sunnyside Yard. The existing systems, which were installed in the 1920s and 1930s, were due for rehabilitation because of age and as a preventative measure to help ensure that the catenary lines would hold in extreme weather events, such as a windstorm.

The project scope included installing 1.5 million pounds of miscellaneous and structural steel to support 15 miles of registered track; adjusting new heights and staggers on the new insulator assemblies for catenary on new and existing structures; removing the old catenary supporting system, which included hanging beam and main messenger support cable; and establishing new controls and communications for a new crossover. Crews installed 132 new structures around bridges to make the wire meet the track’s curve criteria.

An early project milestone was the completion of an interlock. This fast-tracked phase of the project needed to be completed by July 31, 2007 to ensure that Amtrak maintained the flexibility to move its trains. Close cooperation between Amtrak and the project team ensured that the milestone was met on time.

Phase 2 consisted of a network of shallow pipelines that intercept the combined storm and sanitary wastewater, drop it down through shafts, and transport it to tunnels for storage until it can be treated. Work included excavation and lining of a 22-ft.-dia. tunnel constructed 85 to 165 ft. below ground and seven separate shafts located along the alignment. Phase 2 began on March 21, 2006, with final completion on December 1, 2011.

Quick Links
  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact
Featured Projects
RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More
Contact MEC

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

 

General Info : 

info@masselec.com

 

Quick Links

  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact

Featured Projects

RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More

Contact MEC

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

 

General Info : 

info@masselec.com

 
© 2023 Mass. Electric Construction Co. All Rights Reserved.
  • Privacy Statement
  • Terms & Conditions
Proud member of the International Brotherhood of Electrical Workers.
Menu